ICP DAS PMC-523x/PMC-224x/PMD Series User Manual
187
Time Range.
(c.)
On the calendars, click to toggle highlight on the dates you’d
like to execute or not execute the operations for this Schedule.
If the date shows a light green background, it indicates the date
is “In Range” of the schedule, that is, that date falls into the
range that will execute the operations. On the contrary, if the
date shows a light grey background, it indicates that date is
“Out of Range” of the schedule, that is, that date falls out of the
range and will not execute the operations.
By default, all dates
will be “In Range”, that is, during the date range you select, the
operation will be executed every day.
“Select All”
button is
used to set all dates to be “In Range”; whereas
“Unselect All”
button is for marking all dates to be “Out of Range”. The
Weekday
button is for you to select all Mondays to Fridays to
be “In Range”, and Saturdays and Sundays to be “Out of
Range”, that is, the operations will be executed during
weekdays only. On the contrary, the
Weekend
button is for you
to set all Saturdays and Sundays to be “In Range”, and all
Mondays to Fridays to be “Out of Range”, that is, the
operations will be executed during weekends only.
Repeat
:
(a.)
In the “Day(s) of week” section, click on the day(s) in a week
that is going to execute the schedule; shown as below:
Figure10-51 :
Repeat mode of Schedule setting
Содержание PMC-523 Series
Страница 1: ...ICP DAS PMC 523x PMC 224x PMD Power Meter Concentrator Series User Manual Version 3 2 4...
Страница 54: ...ICP DAS PMC 523x PMC 224x PMD Series User Manual 39 Figure5 32 Energy Usage Breakdown by Circuit Group Chart...
Страница 165: ...ICP DAS PMC 523x PMC 224x PMD Series User Manual 150 Figure9 14 The Import of MQTT Topic...
Страница 205: ...ICP DAS PMC 523x PMC 224x PMD Series User Manual 190 Figure10 53 PUE Setting Page 2...