![IBM x3850 X5 Скачать руководство пользователя страница 465](http://html1.mh-extra.com/html/ibm/x3850-x5/x3850-x5_implementation-manual_4092721465.webp)
Chapter 8. IBM BladeCenter HX5
445
You might see the following effects of split power domains for HX5 with MAX5 configurations:
A loss of power to either power domain results in complete system shutdown.
The HX5 will not be able to power on if the attached MAX5 in slot 8 has no power, because
the HX5 treats the entire system as a single unit. You must remove the IBM HX5 MAX5
1-Node Scalability kit to allow the HX5 to resume normal operation if power cannot be
restored to the second power domain that contains the MAX5.
Where possible, avoid placing HX5 4-socket or HX5 and MAX5 configurations across blade
bays 7 and 8.
BladeCenter design: The loss of power to an entire power domain is extremely unlikely
due to the redundant design of the BladeCenter H chassis. We provide this information
merely for guidance in the case of this unlikely event.
Содержание x3850 X5
Страница 2: ......
Страница 3: ...International Technical Support Organization IBM eX5 Implementation Guide May 2011 SG24 7909 00...
Страница 20: ...xviii IBM eX5 Implementation Guide...
Страница 32: ...12 IBM eX5 Implementation Guide...
Страница 34: ...14 IBM eX5 Implementation Guide...
Страница 74: ...54 IBM eX5 Implementation Guide...
Страница 136: ...116 IBM eX5 Implementation Guide...
Страница 238: ...218 IBM eX5 Implementation Guide...
Страница 392: ...372 IBM eX5 Implementation Guide...
Страница 466: ...446 IBM eX5 Implementation Guide...
Страница 484: ...464 IBM eX5 Implementation Guide Figure 9 14 IMM Remote Control Video Viewer showing power control options...
Страница 560: ...540 IBM eX5 Implementation Guide...
Страница 564: ...544 IBM eX5 Implementation Guide...
Страница 578: ...IBM eX5 Implementation Guide IBM eX5 Implementation Guide...
Страница 579: ......