![background image](http://html1.mh-extra.com/html/ibm/san-volume-controller-2145-cg8/san-volume-controller-2145-cg8_hardware-maintenance-manual_4016998106.webp)
5.
Push the back rail bracket
1
(Figure 62) toward the front of the rail until it stops. The rail is now at
its shortest adjustment.
1
Latch-lever
2
Latch-lock
3
Back rail bracket
6.
Place the front end of the left rail in the rack cabinet. Align the top of the front bracket
1
(Figure 63) with the required EIA marking that is on the rack.
1
Front bracket
2
Rack-mounting flange
3
Locating pins
Figure 62. Opening the back latch-lock carrier assembly
1
2
3
Figure 63. Installing the front end of the rail
76
IBM SAN Volume Controller Hardware Maintenance Guide
Содержание SAN Volume Controller 2145-CG8
Страница 1: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Страница 2: ......
Страница 3: ...System Storage SAN Volume Controller Hardware Maintenance Guide Version 6 2 0 GC27 2283 00...
Страница 14: ...xii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 24: ...xxii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 30: ...xxviii IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 54: ...24 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 362: ...332 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 364: ...334 IBM SAN Volume Controller Hardware Maintenance Guide...
Страница 371: ......
Страница 372: ...Part Number 31P1584 Printed in USA GC27 2283 00 1P P N 31P1584...