Chapter 7. Completing the Installation
This chapter describes the following:
Checking that you have installed all required components.
Powering on the 8265.
Verifying that components are operating correctly.
Checking Your Installation
Use the following table to check that you have installed all the required components. Refer to the relevant
page if you have omitted a component.
Table 7 lists the items to have been installed.
Table 7. Installation Steps
Item
Required/Optional
See
Cable Management Tray
optional
page 8
DC power supply power cord preparation
required if DC power used
page 23
AC or DC power supplies
2 minimum required
page 20 or 21
Power supply bay grille
optional
page 26
Control Point and Switch module(s).
1 minimum required
page 29
PCMCIA card for CPSW module
required
page 30
Memory upgrade for CPSW module
optional
page 31
Controller module(s)
1 minimum required only when
standard CPSW used
page 33
Configuration console
required
page 39
Note: You should also have switched each power supply unit to ON.
Copyright IBM Corp. 1994, 1998
45
Содержание 8265 Nways ATM Switch
Страница 1: ...8265 Nways ATM Switch IBM Installation Guide SA33 0441 02...
Страница 2: ......
Страница 3: ...8265 Nways ATM Switch IBM Installation Guide SA33 0441 02...
Страница 8: ...vi IBM 8265 Installation Guide...
Страница 10: ...viii IBM 8265 Installation Guide...
Страница 12: ...x IBM 8265 Installation Guide...
Страница 14: ...xii IBM 8265 Installation Guide...
Страница 32: ...18 IBM 8265 Installation Guide...
Страница 52: ...38 IBM 8265 Installation Guide...
Страница 68: ...54 IBM 8265 Installation Guide...
Страница 88: ...Models 17S Serial Number Located on the 8265 chassis label 74 IBM 8265 Installation Guide...
Страница 98: ......
Страница 101: ......
Страница 102: ...IBM SA33 441 2...