![IBM 4800-741 Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/ibm/4800-741/4800-741_planning-installation-and-operation-manual_3313398047.webp)
Step
2.
Wide
units
only:
Installing
the
expansion
housing
and
the
optional
UPS
This
procedure
is
for
wide
units
only.
1.
See
Figure
15.
Remove
the
retainer
bracket
from
the
expansion
housing
as
follows:
a.
Turn
the
retaining
screw
to
the
left
to
unlock
the
bracket
from
the
housing.
b.
Pull
the
bracket
to
the
right
and
then
lift
out
to
remove
it
from
the
notches.
Figure
15.
Removing
the
retainer
bracket
Updated
October
31,
2007
Chapter
2.
Installation
and
system
setup
27
Содержание 4800-741
Страница 2: ......
Страница 127: ...Figure 111 Using the coin roll cutter Updated October 31 2007 Chapter 6 Operating POS I O devices 107...
Страница 143: ...IBM IBM GA27 4004 GA27 4004 Updated October 31 2007 Appendix A Safety information 123...
Страница 163: ......
Страница 164: ...Updated October 31 2007 GA27 4328 04...