Installation & Commissioning Report
Model Number _____________________ Serial Number ________________________________
Date of Installation ________ Address of installation ____________________________________
User contact information __________________________________________________________
Installer Information (Company & Address)_____________________________________________
Phone/Fax/E-mail ________________________________________________________________
Fuel:
□
Natural Gas
□
Propane
Gas Supply Pressure (high fire) ____ Inches w.c. Measured Rate of Input (high fire) _____Btu/hr
□
Leak testing completed
□
Gas piping
□
Venting system
□
Fan
□
combustion components
□
System Cleaned and Flushed (type of cleaner used) __________________________________
□
System Filled (type/concentration of any glycol/chemicals used) _________________________
□
Air purge completed
□
Relief Valve correctly installed and piped Relief valve “try lever” test performed
□
Condensate trap filled Condensate drain clear and free flowing Condensate Neutralization.
□
Ignition Safety Shutoff test completed. Flame current - High fire _____ µA - Low fire _____ µA
□
Owner advised and instructed in the safe operation and maintenance of the boiler and system.
□
Information regarding the appliance and installation received and left with owner
Combustion Readings: CO
2
_____________ % O
2
______________ % CO ____________ ppm
Flue temperature ___ Return water temperature (measure simultaneously with flue temp.) _____
Commissioning has been completed as listed on this report - Installer's Signature _____________
Installers: send this completed sheet - Fax to 604 877 0295 - or - scan and Email to
[email protected].
115
Installation & Commissioning Report
Содержание SL Series
Страница 8: ...Intentionally left empty...
Страница 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Страница 14: ...Intentionally left empty...
Страница 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Страница 76: ...Intentionally left empty...
Страница 96: ...Intentionally left empty...
Страница 108: ...Intentionally left empty...
Страница 109: ...105 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 45 Controller electrical diagram...
Страница 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Страница 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...
Страница 113: ...Item Description Part ID Kit Quantity 200 Fan or 240 113 P 311 1 109 Boiler part diagrams SL 26 260 G3...