Installing the new gas valve
1. Secure the new gas valve to the gas valve connector
with the 4 bolts, ensuring that
the O-ring
is in place.
2. Attach the aluminum gas block
to the new gas valve, ensuring that the O-ring is in
place.
If this O-ring is lost, it must be replaced with a factory supplied O-ring.
Tighten by hand the 4 gas inlet block screws plus an extra ½ turn in a criss-cross
pattern.
3. Connect the wires to the gas valve.
4. Open up the gas supply valve, and check for leaks.
5. Tune the gas valve.
84
Section: Service and maintenance
Содержание SL Series
Страница 8: ...Intentionally left empty...
Страница 12: ...Figure 5 Top view SL 40 399 G3 Figure 6 Bottom view SL 40 399 G3 8 Section Specifications...
Страница 14: ...Intentionally left empty...
Страница 64: ...Figure 40 Electric wiring connections 60 Section Installation...
Страница 76: ...Intentionally left empty...
Страница 96: ...Intentionally left empty...
Страница 108: ...Intentionally left empty...
Страница 109: ...105 Appendices Wiring diagrams V 10 Controller electrical diagram Figure 45 Controller electrical diagram...
Страница 110: ...Internal wiring diagram Figure 46 Internal wiring diagram 106 Section Appendices...
Страница 111: ...Sequence of operations Figure 47 Sequence of Operation 107 Sequence of operations...
Страница 113: ...Item Description Part ID Kit Quantity 200 Fan or 240 113 P 311 1 109 Boiler part diagrams SL 26 260 G3...