Page 18
When humidification is needed the display shows the following
message:
The system air pressure is adjusted on the valve (9) and is indi-
cated by the manometer (8).
Note:
Set the atomisation output level as specified in Section
“Output Table”
4.4.4
Setting the Cleaning Interval
The cleaning interval and the duration of cleaning are set ex
works to:
By pressing the button “arrow right” (>) the sub menue “cleaning
interval” appears on the display”.
Bu using the buttons up (
) and down (
) the value for the
cleaning interval can be changed. It is not required to save any
changes - after 10 seconds the control will jump back to the start
menue with saving all changes.
Cleaning
cleaning interval
20 min
duration of cleaning
5 sek. (not changeable)
Содержание CU-1
Страница 1: ...Atomising Vacuum Nozzle System Manual...
Страница 37: ...Page 37 5 4 Example of Installation Fig Example of installation a VN Unit with 4 nozzles...
Страница 38: ...Page 38 Fig Example of installation a VN Unit with 8 VN nozzles and 2 vacuum valves...
Страница 48: ...Page 48 10 EC Declaration of Conformity...
Страница 54: ...Page 54 General 39 Water Installation 39 Wiring Diagram 42...