Page 11
3.
Transport
3.1
General information
Note:
Take care when transporting the HygroMatik vacuum
nozzle system to prevent the device and packaging from being
damaged by impact or accidental loading or unloading.
3.2
Packaging
Note:
Notice the symbols affixed to the packing box.
3.3
Temporary storage
Store the material in a clean dry place. The storage temperature
should be 0-40°C.
Note:
Only clean components may be installed in a ventilation
duct.
Inspecting for correctness and completeness
When you receive the goods, ensure that:
•
the equipment is complete and all parts are in perfect
condition.
Note:
Any transport damages and/or missing parts must be
reported immediately to the shipper or supplier.
The periods in which notification of the transport company must
occur for the purposes of identifying the damage are as follows*:
* Periods are subject to change without notice.
Transport company
Time after receipt of
goods
Post
no later than 24 hours
Rail
7 days at the latest
Rail and road transport
companies
4 days at the latest
Parcel services
immediately
Содержание CU-1
Страница 1: ...Atomising Vacuum Nozzle System Manual...
Страница 37: ...Page 37 5 4 Example of Installation Fig Example of installation a VN Unit with 4 nozzles...
Страница 38: ...Page 38 Fig Example of installation a VN Unit with 8 VN nozzles and 2 vacuum valves...
Страница 48: ...Page 48 10 EC Declaration of Conformity...
Страница 54: ...Page 54 General 39 Water Installation 39 Wiring Diagram 42...