I-85/103
Last change 04/2016 E-P – AL/TW/PW | Subject to technical modifications
Control ClO
2
-content
Quick determination with chlorine dioxide measuring instrument
that can be used within a measuring range of 0.05 to 0.5 mg/l ClO
2
.
Compare with display on control unit.
Volume flow
Check flow measure
– a flow of 200 l/h must be set. The value
must be adjusted by means of the membrane valve if there is any
deviation.
Operation pressure
The display at the pressure gauge must show a value between 2
and 6 bar under operation conditions.
The local pressure increase system and/or the pressure reduction
unit (if existing) must be checked if there is any deviation.
Filling level chemical tubs HCl
/ NaClO
2
The tub must be replaced asap after pre-empty record (see display
control unit).
An empty tub causes a failure record and the plant is stopped
automatically.
A replacement of the respective tub is absolutely necessary to
guarantee a further perfect operation.
Operation display control unit
The operation display for the control unit in operation is according
to chapter VII / point 4.3.
Plant leakage
Visual inspection and control of total plant:
- Pipe connection to dosing pumps
- Intake lance connections
- Leakage in chemical collection tanks
- Reactor cabinet (connections and fittings at reactor)
Inspection of external units
Water meter (flow).
Drinking water tank (filling level control).
Regular information about:
- Water quality
- Pressure conditions,
of the feed (mains) water to be treated is a condition for a perfect and trouble-free operation of
the plant.
Modifications of feed water quality possibly require different programming that may be carried
out by our service personnel only.
Please contact our service under the address as per page 6.
Содержание HydroDOS HD550G
Страница 19: ...I 19 103 Last change 04 2016 E P AL TW PW Subject to technical modifications 2 2 Installation schematics...
Страница 39: ...I 39 103 Last change 04 2016 E P AL TW PW Subject to technical modifications...
Страница 43: ...I 43 103 Last change 04 2016 E P AL TW PW Subject to technical modifications Calibration...
Страница 98: ...I 98 103 Last change 04 2016 E P AL TW PW Subject to technical modifications Technical documents...
Страница 102: ...I 102 103 Last change 04 2016 E P AL TW PW Subject to technical modifications 4 Installation drawing...