UPS2000-G-3 kVA
User Manual (CTC)
3 Installation
Issue 02 (2019-05-05)
Copyright © Huawei Technologies Co., Ltd.
20
The UPS is a large leakage current device. Do not configure a circuit breaker that has the
leakage current protection function. If you need leakage current protection function, use
the earth leakage circuit breaker recommended.
The battery cable cannot be longer than 10 m.
Table 3-2
Recommended power cable specifications
Type
Cross-sectional
Area
Terminal Type
Torque for
Tightening Bolts
PDU AC input power
cable (L/N/PE)
25 mm
2
25 mm
2
M6 OT
terminal
4.8 N·m
PDU AC output
power cable
(L/N/PE)
6 mm
2
6 mm
2
M4 OT
terminal
2.8 N·m
UPS output power
cable (sL/N/PE)
6 mm
2
OT-6 mm
2
-M4
terminal/OT-6
mm
2
-M6
terminal/OT-6
mm
2
-M6 90° terminal
2.8 N·m
UPS input power
cable (L/N/PE)
6 mm
2
OT-6 mm
2
-M4
terminal/6 mm
2
M6
OT terminal
2.8 N·m
UPS battery cable (+,
N, N, –, PE)
6 mm
2
OT-6 mm
2
-M6
terminal /OT-6
mm
2
-M6 90° terminal
/OT-16 mm
2
-M6
terminal
2.8 N·m
Battery cable (+, –)
6 mm
2
OT-6 mm
2
-M6
terminal /OT-6
mm
2
-M4 terminal
2.8 N·m
UPS CAN
communications
cable
Ethernet cable
RJ45 terminal
-
Battery CAN
communications
cable
Ethernet cable
RJ45 terminal
-
PDU PE
25 mm
2
25 mm2 M6 OT
terminal
4.8 N·m
Battery PE
6 mm
2
6 mm2 M6 OT
terminal
4.8 N·m