PDU8000 Modular Precision PDC V2.0
User Manual
5 Installation Guide
Issue 03 (2018-01-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
30
5
Installation Guide
5.1 Site Requirements
The PDC site requirements are as follows:
Far away from dust, smoke, harmful gas, and corrosive, flammable, or explosive objects.
Free of interference from strong electromagnetic fields.
Cabling space should be planned for the site, and cable ladders and cable trays should be
designed for the PDC installation position.
The error of the installation platform levelness must be less than 10 mm.
Meets the PDC input rating requirements (see the Schematic Diagram delivered with the
product for details).
Temperature: -5°C to +40°C
Relative humidity: 5%-95% RH, non-condensing
Altitude: < 2000 m (derated when the altitude exceeds 2000 m). For the derating details,
contact Huawei technical support.
Huawei will not be liable for any consequences caused if the installation environment does not meet the
requirements.
5.2 Installation Preparations
Before installation, unpack and check the product, make available all required technical
documents, tools, and materials, check the installation environment, and train onsite
installation personnel.
5.2.1 Obtaining Technical Documents
Table 5-1
Technical documents
Technical Document
Function
Obtaining Method
Schematic diagram
Shows the circuit breaker
control relationship in the
PDC.
Delivered with the product.