PDU8000 Modular Precision PDC V2.0
User Manual
8 Maintenance Guide
Issue 03 (2018-01-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
142
Figure 8-22
Installing an MCB
Step 5
Install all other MCBs in the same way according to the capacity expansion principles.
The number of MCBs to be installed vary depending on site requirements.
Each reserved label code corresponds to one 1P MCB. A 3P MCB takes up three label codes.
Step 6
Reinstall the front panel.
Step 7
Tap
Maint.
on the
System Info.
screen to enter the
Expansion Settings
screen.
Figure 8-23
Capacity expansion settings
Second method for setting capacity expansion: Turn on the MCB. The dialog box for setting capacity
expansion is displayed on the MDU. If you do not want to set capacity expansion, cancel the displayed
dialog box for setting capacity expansion for three consecutive times to cancel capacity expansion
settings.
Step 8
Tap
Add
to set the MCB quantity, phases, and capacity.