
FULLTEST3
EN - 63
1. Press the
FUNC
key and select the
URES
function. The following screen is
shown on the display
Fig. 57 : URES initial screen
2. Select the test parameters on the instrument (see Table 10) and carry out the
desired setup
Parameter Description
Value
MODE Measurement
mode
LIN (Linear), NONLIN (Non-
Linear)
CON
Type of connection
INT (measure on internal
component), PLUG (measure on
1Phase/3Phase plug)
LIMIT t
Limit time
1s, 5s
Table 10 : Setup parameters of URES
function
3. Check selected mode and modify it if needed by pressing the
MODE
touch-
screen key first
4. Check selected connection and modify it if needed by pressing the
CON
touch-
screen key first
5. Check selected limit time and modify it if needed by pressing the
LIMIT t
touch-
screen key first
6. Select measurement screen by pressing the
touch-screen key and check all
settings again
7. Connect test leads according to one of the below figures
Fig. 58 : Connection for U
RES
INT measurement on 1P/3P plugged machines
Содержание FULLTEST3
Страница 1: ... Copyright HT ITALIA 2020 Release EN 2 01 13 01 2020 FULLTEST3 User manual ...
Страница 2: ......
Страница 99: ......