10.3.9 Checking the fastening of the fuel tank
The machine is equipped with a fuel tank or tanks. These are fastened with lashing strips and
ratchets.
Precondition The machine is shut down.
The machine is standing level.
The machine is fully vented, the pressure gauge reads 0 bar.
The machine is cooled down.
All compressed air consumers are disconnected and the air outlet valves are open.
NOTICE
The lashing strip of the fuel tank is overly tightened.
The plastic tank can be damaged by excessive tightening of the lashing strips.
The fuel tank may burst and spill.
➤ Do not overtighten the lashing strips.
➤ Slightly hand-tighten the lashing strips.
Carry out visual check
1. Check the lashing strips for tears and fraying in the fabric, and for damages to the ratchet.
Change any damaged lashing strip immediately.
2. Check whether the lashing strips are tight with the tank and that the ratchet is closed.
If the lashing strips sits loose, or the ratchet is not closed properly, tighten the fastening.
Tightening the fastening of the fuel tank:
The lashing strips are tensioned via the integrated ratchet.
The lashing strips must fit closely around the fuel tank. The tensioning force of the strips must not
exceed 10 daN (slightly hand-tighten only).
➤ Hand-tighten the lashing strip with the integrated ratchet and push the ratchet to the strip.
10.4 Compressor Maintenance
➤ Perform maintenance tasks according to the schedule in chapter 10.2.3.1.
10.4.1 Checking cooling oil level
The oil level is checked at the oil separator tank filling port. Oil must be visible in the port when the
filler plug is removed.
Material Wrench
Cleaning cloth
Precondition The machine is shut down.
The machine is standing level.
The machine is fully vented, the pressure gauge reads 0 bar.
All compressed air consumers are disconnected and the air outlet valves are open.
10 Maintenance
10.4 Compressor Maintenance
No.: 9_9548 22 HCE
Operating Manual Portable Rotary Screw Compressor
MOBILAIR M27 PE
123
Содержание MOBILAIR M27 PE
Страница 2: ...Original instructions KKW M27 2 23 en Z2 SBA MOBILAIR PE 20211108 100635...
Страница 8: ...Contents vi Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 268: ...13 Annex 13 4 Wiring diagrams 256 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 269: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 257...
Страница 270: ...13 Annex 13 4 Wiring diagrams 258 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 271: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 259...
Страница 273: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 261...
Страница 274: ...13 Annex 13 4 Wiring diagrams 262 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 275: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 263...
Страница 276: ...13 Annex 13 4 Wiring diagrams 264 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 278: ...13 Annex 13 4 Wiring diagrams 266 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 279: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 267...
Страница 280: ...13 Annex 13 4 Wiring diagrams 268 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 281: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 269...