10.2 Following the maintenance plans
10.2.1 Logging maintenance work
The maintenance intervals given are those recommended for KAESER original components
with average operating conditions.
➤ In adverse conditions (e.g. oil and filter changes), perform maintenance work at shorter
intervals.
Adverse conditions are, e.g.:
■ poor fuel quality
■ high/low temperatures
■ much dust
■ frequent use
➤ Adjust the maintenance intervals with regard to local installation and operating condi‐
tions.
➤ Logging all maintenance work.
This enables you to determine the frequency of individual maintenance tasks and deviations
from our recommendations.
Further information A list is available in chapter 10.10.
10.2.2 Maintenance tasks after commissioning
The table below lists maintenance tasks required after commissioning (initial start-up).
➤ Perform maintenance tasks according to the following schedule.
Component:
Task
after the first 50 h
after the first half year (250 hours)
see chapter
Note
Drive engine:
Have fuel lines and clamps
checked.
X
KS, FW
–
h ≙ operating hours
KS ≙ Contact KAESER SERVICE,
FW ≙ Contact specialised workshop.
Tab. 89 Maintenance tasks after commissioning
10.2.3 Regular maintenance tasks
The following table lists the various maintenance intervals for the machine.
Maintenance interval
Short description
Daily
–
Every 250 h, at least annually
A250
10 Maintenance
10.2 Following the maintenance plans
No.: 9_9548 22 HCE
Operating Manual Portable Rotary Screw Compressor
MOBILAIR M27 PE
95
Содержание MOBILAIR M27 PE
Страница 2: ...Original instructions KKW M27 2 23 en Z2 SBA MOBILAIR PE 20211108 100635...
Страница 8: ...Contents vi Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 268: ...13 Annex 13 4 Wiring diagrams 256 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 269: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 257...
Страница 270: ...13 Annex 13 4 Wiring diagrams 258 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 271: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 259...
Страница 273: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 261...
Страница 274: ...13 Annex 13 4 Wiring diagrams 262 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 275: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 263...
Страница 276: ...13 Annex 13 4 Wiring diagrams 264 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 278: ...13 Annex 13 4 Wiring diagrams 266 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 279: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 267...
Страница 280: ...13 Annex 13 4 Wiring diagrams 268 Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE No 9_9548 22 HCE...
Страница 281: ...13 Annex 13 4 Wiring diagrams No 9_9548 22 HCE Operating Manual Portable Rotary Screw Compressor MOBILAIR M27 PE 269...