Site prep time allowances
The following site prep tasks may require several weeks to complete:
• Acquiring required power connectors
• Arranging for an electrician
• Adding or modifying air conditioning systems
• Making building alterations
• Placing an order for data comm equipment
The time between placing an equipment order and actual delivery can vary.
Contact your HP representative to determine the best estimated delivery
dates.