4
HP StorageWorks XP12000 Disk Array Site Preparation Guide
Raised floor requirements 28
Floor covering 29
Floor cutouts 29
Space planning requirements 32
The space planning process 32
Floor clearance 33
Environmental requirements 46
Altitude 46
Air conditioning 46
Temperature 47
Humidity 47
Mechanical vibration 48
Shock 49
Heat dissipation and power consumption 49
Acoustics 50
Dust and pollution control 50
Metallic particulate contamination 50
Data comm requirements 52
Electrical requirements 53
Line voltage 53
Branch circuit breakers 53
Frequency 54
Safety and dedicated ground 54
Grounding requirements 54
Receptacles 55
Power line transients 56
Maximum peak inrush and crest factor 57
Uninterruptible power supply (UPS) 58
Sources of electrical interference 59
Delivery space requirements 60
3 Delivery and Unpacking 61
Checking for shipping shortage and damage 62
Unpacking the equipment 63
Packaging configurations 63
Required personnel 63
Required tools 63
Unpacking process 64
Содержание StorageWorks XP12000
Страница 6: ...6 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 10: ...10 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 30: ...30 HP StorageWorks XP12000 Disk Array Site Preparation Guide DKC floor cutouts Figure 2 DKC floor cutouts ...
Страница 31: ...Site Requirements 31 DKU floor cutout Figure 3 DKU floor cutout ...