Index
97
line current 70, 71, 72
line voltage 53, 70–72
M
maximum peak inrush 57
mechanical vibration specifications 48
metallic particulate contamination 50
moisture 25
N
noise level 50
O
operating voltages
50-amp single-phase DKC 70
50-amp single-phase DKU 71
30-amp single-phase DKC 70
30-amp single-phase DKU 72
30-amp three-phase DKC 71
30-amp three-phase DKU 72
P
particulate contamination, metallic 50
peak inrush, maximum 57
“phone home” 52
phone line 52
physical specifications 18–24
pollution control 50
power consumption 49
power cords 70, 71, 72
floor cutouts for 29–31
single-phase for Europe 81–82
single-phase for USA 78–79
three-phase for Europe 76–77
three-phase for USA 74–75
power line transients 56
R
raised floor 28–31, 32
See also
floor
receptacles 56, 73
representatives, of HP.
See
HP representatives
reseller, authorized 9
S
safety 27
sales representative.
See
HP SR
service clearance 32
servicing hazards 27
shock specifications 49
single-phase cabling
Europe 81–82
USA 78–80
single-phase circuit breakers 53
site prep
checklist 13
customer responsibilities 12
objectives 11
resources 11
tasks 13
team 12
time allowances 16
sound pressure 50
space planning 32–45
SR.
See
HP SR
static discharge mats 29
T
technical support 8
temperature 47
30-amp single-phase DKC 70
30-amp single-phase DKU 72
30-amp three-phase DKC 71
30-amp three-phase DKU 72
three-phase cabling
Europe 76–77
USA 74–75
three-phase circuit breakers 53
Содержание StorageWorks XP12000
Страница 6: ...6 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 10: ...10 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 30: ...30 HP StorageWorks XP12000 Disk Array Site Preparation Guide DKC floor cutouts Figure 2 DKC floor cutouts ...
Страница 31: ...Site Requirements 31 DKU floor cutout Figure 3 DKU floor cutout ...