Electrical Specifications
77
When connecting to 380- to 415-volt service, a WYE configuration with
neutral and ground conductors (in addition to the three-phase wires, for a
total of five wires) is required.
Warning
High leakage current can occur between the power supply and the unit. To
avoid electrical shock, be sure to make the protective earth connection
before the supply connections.
Branch circuit requirements
When the supplied line to line voltage is in the 380- to 415-volt range, the
connection must be a five-wire WYE or STAR connection.
To protect the disk array, your building must be wired correctly. Each
supply (“hot”) conductor must be protected by a short-circuit protective
device and by an overcurrent protective device. Table 25
(page 71)
and
Table 28
(page 72)
provide specifications for the overcurrent protective
devices required for three-phase operation.
All protective devices must comply with national standards of the country
where the units are to be installed. If a protective device interrupts a supply
conductor, it must also interrupt all other supply conductors.
Overcurrent protection is also required for the neutral conductor.
Содержание StorageWorks XP12000
Страница 6: ...6 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 10: ...10 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 30: ...30 HP StorageWorks XP12000 Disk Array Site Preparation Guide DKC floor cutouts Figure 2 DKC floor cutouts ...
Страница 31: ...Site Requirements 31 DKU floor cutout Figure 3 DKU floor cutout ...