66
HP StorageWorks XP12000 Disk Array Site Preparation Guide
Removing packaging materials
Unpack the DKC first. DKC packaging contains a wooden ramp; standard
DKU packaging does not
1
. You will use the ramp to unload both the DKC
and DKUs.
1. If shipped in a wooden crate:
a. Using an 11mm (7/16") ratchet or wrench, remove the six lag screws
at the base of crate.
b. Using the claw end of a claw hammer, remove the crate clamps.
Warning
Crate clamps are under tension. Wear safety glasses and hold onto the
clamp with your free hand during removal.
c. Remove the crate panels.
1 DKUs shipped as upgrades (without a DKC) will contain a ramp.
Содержание StorageWorks XP12000
Страница 6: ...6 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 10: ...10 HP StorageWorks XP12000 Disk Array Site Preparation Guide ...
Страница 30: ...30 HP StorageWorks XP12000 Disk Array Site Preparation Guide DKC floor cutouts Figure 2 DKC floor cutouts ...
Страница 31: ...Site Requirements 31 DKU floor cutout Figure 3 DKU floor cutout ...