Removal and replacement procedures 30
Rack warnings
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
•
The leveling jacks are extended to the floor.
•
The full weight of the rack rests on the leveling jacks.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
WARNING:
To reduce the risk of personal injury or equipment damage when unloading a rack:
•
At least two people are needed to safely unload the rack from the pallet. An empty 42U rack
can weigh as much as 115 kg (253 lb), can stand more than 2.1 m (7 ft) tall, and might
become unstable when being moved on its casters.
•
Never stand in front of the rack when it is rolling down the ramp from the pallet. Always handle
the rack from both sides.
WARNING:
To reduce the risk of personal injury or damage to the equipment, adequately
stabilize the rack before extending a component outside the rack. Extend only one component at
a time. A rack may become unstable if more than one component is extended.
WARNING:
When installing a server in a telco rack, be sure that the rack frame is adequately
secured at the top and bottom to the building structure.
Preparation procedures
To access some components and perform certain service procedures, you must perform one or more of the
following procedures:
•
Access the product front panel ("
Remove the security bezel (optional)
" on page
31
).
•
Power down the server (on page
31
).
If you must remove a server from a rack or a non-hot-plug component from a server, power down the
server.
•
Extend the server from the rack (on page
32
).
If you are performing service procedures in an HP, Compaq branded, Telco, or third-party rack cabinet,
you can use the locking feature of the rack rails to support the server and gain access to internal
components.
For more information about Telco rack solutions, see the RackSolutions website
(
http://www.racksolutions.com/hp
).
•
Access the product rear panel (on page
33
).
•
Remove the server from the rack (on page
34
).
If the rack environment, cabling configuration, or the server location in the rack creates awkward
conditions, remove the server from the rack.
Содержание ProLiant DL380e Gen8
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 19: ...Illustrated parts catalog 19 ...
Страница 41: ...Removal and replacement procedures 41 o Original release optical drive cage o Redesigned optical drive cage ...
Страница 98: ...Component identification 98 Fan locations ...
Страница 116: ...Cabling 116 o Single rank GPU o Dual rank GPU System board connection options o Primary GPU power cabling ...
Страница 117: ...Cabling 117 o Secondary GPU power cabling ...