
Removal and replacement procedures 53
c.
Finish the installation by completely tightening the screws in the same sequence.
4.
Install the air baffle.
5.
Install the access panel.
6.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
7.
Connect each power cord to the server.
8.
Connect each power cord to the power source.
9.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
Processor
The server supports single-processor and dual-processor operations.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To avoid damage to the processor and system board, only authorized personnel
should attempt to replace or install the processor in this server.
CAUTION:
To prevent possible server malfunction and damage to the equipment, multiprocessor
configurations must contain processors with the same part number.
CAUTION:
To prevent possible server overheating, always populate processor socket 2 with a
processor and a heatsink or a processor socket cover and a heatsink blank.
IMPORTANT:
If installing a processor with a faster speed, update the system ROM before
installing the processor.
Содержание ProLiant DL380e Gen8
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 19: ...Illustrated parts catalog 19 ...
Страница 41: ...Removal and replacement procedures 41 o Original release optical drive cage o Redesigned optical drive cage ...
Страница 98: ...Component identification 98 Fan locations ...
Страница 116: ...Cabling 116 o Single rank GPU o Dual rank GPU System board connection options o Primary GPU power cabling ...
Страница 117: ...Cabling 117 o Secondary GPU power cabling ...