Removal and replacement procedures 77
c.
Finish the installation by completely tightening the screws in the same sequence.
11.
Install all components removed from the failed system board.
12.
Connect all cables disconnected from the failed system board.
13.
Install the PCI riser cages.
14.
Install the air baffle.
15.
Install the access panel.
16.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
17.
Install the power supplies.
18.
Connect each power cord to the server.
19.
Connect each power cord to the power source.
20.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
IMPORTANT:
Install all components with the same configuration that was used on the failed
system board.
Re-entering the server serial number and product ID
After you replace the system board, you must re-enter the server serial number and the product ID.
1.
During the server startup sequence, press the
F9
key to access RBSU.
2.
Select the
Advanced Options
menu.
3.
Select
Service Options
.
4.
Select
Serial Number
. The following warning appears:
Содержание ProLiant DL380e Gen8
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 19: ...Illustrated parts catalog 19 ...
Страница 41: ...Removal and replacement procedures 41 o Original release optical drive cage o Redesigned optical drive cage ...
Страница 98: ...Component identification 98 Fan locations ...
Страница 116: ...Cabling 116 o Single rank GPU o Dual rank GPU System board connection options o Primary GPU power cabling ...
Страница 117: ...Cabling 117 o Secondary GPU power cabling ...