Hardware options installation 43
IMPORTANT:
For additional installation and configuration information, see the documentation
that ships with the option.
To install the component:
1.
Power down the server (on page
17
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
17
).
o
Remove the server from the rack (on page
19
).
4.
Remove the access panel (on page
20
).
5.
Remove the secondary PCI riser cage. ("
Remove the PCI riser cage
" on page
23
)
CAUTION:
When connecting or disconnecting the cache module cable, the connectors on the
cache module and cable are susceptible to damage. Avoid excessive force and use caution to
avoid damage to these connectors.
6.
If you intend to use an FBWC module, install the module on the storage controller. Depending on the
controller model, the cable connector on the cache module might be facing up or down when the
module is installed on the controller board.
a.
Connect the cache module backup power cable to the module.
Содержание ProLiant DL120 Gen9
Страница 16: ...Component identification 16 Fan locations ...
Страница 24: ...Operations 24 o PCI blank 7 Remove any expansion boards installed in the primary riser cage ...
Страница 120: ...Support and other resources 120 ...
Страница 121: ...Support and other resources 121 ...