Operations 23
4.
Power up the server (on page
17
).
Remove the PCI riser cage
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to the server or expansion boards, power down the server, and
disconnect all power cords before removing or installing the PCI riser cage.
1.
Power down the server (on page
17
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
17
).
o
Remove the server from the rack (on page
19
).
4.
Remove the access panel (on page
20
).
5.
Disconnect all cables connected to existing expansion boards.
6.
Remove the secondary PCI riser cage or PCI blank.
o
Secondary PCI riser cage
Содержание ProLiant DL120 Gen9
Страница 16: ...Component identification 16 Fan locations ...
Страница 24: ...Operations 24 o PCI blank 7 Remove any expansion boards installed in the primary riser cage ...
Страница 120: ...Support and other resources 120 ...
Страница 121: ...Support and other resources 121 ...