Hardware options installation 79
1.
Power down the server (on page
24
).
2.
Do one of the following:
o
Open or remove the tower bezel, as needed ("
Open or remove the tower bezel
" on page
25
).
o
Extend the server from the rack (on page
24
).
3.
Remove the access panel (on page
26
).
4.
Locate the cache module connector ("
System board components
" on page
11
).
5.
Open the cache module latches.
6.
Install the cache module.
7.
Connect the cable to the cache module.
8.
Connect the cable to the battery pack.
9.
Install the battery pack.
Содержание ML350 - ProLiant - G2
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...