Index 144
Power On button 7, 8, 25, 37
power requirements 33
power supplies 70, 137
powering down 25
powering up 25, 96
power-on problems flowchart 117
pre-diagnostic steps 107
preparation procedures 25, 110
problem diagnosis 107
processors 110
ProLiant Support Pack (PSP) 105
PSPs, overview 105
R
rack installation 31, 34, 36
rack resources 34
rack stability 108
rack warnings 34, 108
RBSU (ROM-Based Setup Utility) 96
RBSU configuration 96
rear panel components 9
rear panel LEDs 10
redundant fan 68
redundant ROM 102
registering the server 38
regulatory compliance notices 128, 131
removable media cage 28
removable media devices 65
required information 139
ROM redundancy 102
ROM-Based Setup Utility (RBSU) 90, 96
ROMPaq utility 101, 102
S
safety considerations 34, 108
SAS drives 18, 54
SATA hard drive 18, 54
SATA optical drive 65
scripted installation 95
serial number 100
series number 128
server fault indications flowchart 122
server features and options 39
service notifications 112
shipping carton contents 35
site requirements 32
SmartStart autorun menu 95
SmartStart Scripting Toolkit 95
SmartStart software 38
SmartStart, overview 95
space requirements 32
specifications, environmental 136
specifications, power 137
specifications, server 136
start diagnosis flowchart 113
static electricity 135
support 104, 139
support packs 95
supported operating systems 105
symbols on equipment 108
symptom information 109
system battery 126
system board 12, 14
system board battery 133
system board LEDs 14
system maintenance switch 12, 15
system power LED 8, 19
T
Taiwan battery recycling notice 134
tape drives 65
technical support 139, 140
telephone numbers 139, 140
temperature requirements 32
tower bezel, removing 27
tower server, setting up 34, 35
tower-to-rack conversion 91
TPM (Trusted Platform Module) 88, 90
troubleshooting 107
Trusted Platform Module (TPM) 88, 90
U
UID LED 8, 10, 15, 25
updating the system ROM 102
USB support 102
utilities 95
utilities, deployment 95, 96
V
ventilation 31
video/graphics controller power cable 85
W
warnings 34, 108
website, HP 140
Содержание ML350 - ProLiant - G2
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...