Operations 25
3.
After performing the installation or maintenance procedure, press the rail-release latches and slide the
server back into the rack.
Remove the server from the rack
To remove the server from an HP, telco, or third-party rack:
1.
Power down the server (on page
24
).
2.
Disconnect the cabling.
3.
Extend the server from the rack (on page
24
). Reverse the server installation steps in the documentation
that ships with the rack-mounting option.
4.
Remove the server from the rack.
5.
Place the server on a sturdy, level surface.
Access the server rear panel (rack model)
If the procedure requires accessing the server rear panel, unlock the cable management arm and swing the
arm away from the server. For information on unlocking the cable management arm, refer to the installation
instructions that ship with the 3-7U Quick Deploy Rail System.
Open or remove the tower bezel
This server has a removable bezel that must be unlocked and opened before accessing the front panel
components. The bezel should be kept closed during normal server operations.
Use the key provided with the server to unlock the bezel with a clockwise turn.
If necessary, remove the bezel.
CAUTION:
To avoid breaking the bezel, remove the bezel before placing the server on its side.
Содержание ML350 - ProLiant - G2
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...