Hardware options installation 61
o
The connector labeled "2LFF" of the mini-SAS Y-cable to the optional hard drive cage.
7.
Position the hard drive cage near the optional drive cage bay, and then thread the drive cables through
the bay.
8.
Slide the optional hard drive cage about three-fourth of the way into the bay, leaving room to connect
cables at the back of the drive cage.
9.
Connect the following cables:
o
The power cable to the optional hard drive cage.
o
The sideband LED cable from the optional hard drive cage to the primary hard drive cage.
Содержание ML350 - ProLiant - G2
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...