Hardware options installation 38
6.
Place the tower server on the side.
CAUTION:
Failure to completely open the processor locking lever prevents the processor from
seating during installation, leading to hardware damage.
7.
Open the processor locking lever and the processor socket retaining bracket.
Do not remove the
processor socket cover
.
IMPORTANT:
Be sure the processor remains inside the processor installation tool.
Содержание ML350 - ProLiant - G2
Страница 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Страница 112: ...Troubleshooting 112 ...
Страница 130: ...Server specifications 130 Maximum peak power 460 W at 100V to 120V AC input 460 W at 200V to 240V AC input ...
Страница 137: ...Technical support 137 ...
Страница 138: ...Technical support 138 ...