Operational Space for an NS7 System
Verify
√
NS7 system site layout, uses the equipment dimensions, door swing, and service clearances listed in
“Dimensions and Weights for NS7 AC Systems” (page 50)
and takes advantage of existing lighting and electrical
outlets.
Airflow direction and current or future air conditioning ducts are not obstructed. Eliminate any obstructions to
equipment intake or exhaust air flow. See
“Cooling and Humidity Control” (page 21)
Adequate space planning to allow for future equipment.
Site layout plan includes provisions for things such as channels or fixtures used for cable routing, cables, patch
panels, and storage areas.
Operational Space for an NS7 System
23
Содержание Integrity NonStop X NS7
Страница 8: ...Figure 1 Example NS7 System Configurations 42U and 36U 8 HPE Integrity NonStop X NS7 Systems ...
Страница 39: ...Figure 14 Example of Bottom AC Power Feed in a Rack Without UPS AC Power Feeds in the Rack 39 ...
Страница 40: ...Figure 15 Example of Top AC Power Feed in a Rack Without UPS 40 NS7 System Installation Specifications ...
Страница 41: ...Figure 16 Example of Top AC Power Feed in a Rack With Single Phase UPS AC Power Feeds in the Rack 41 ...
Страница 43: ...Figure 18 Example of Top AC Power Feed in a Rack With Three Phase UPS AC Power Feeds in the Rack 43 ...
Страница 62: ...62 HPE Integrity NonStop X NS7 CG X2 System ...