Installing the HC380 appliance nodes 28
General virtualization configuration (all 1 GbE appliance)
The following cabling example shows the use of three 1 GbE switches with the all 1 GbE appliance. This
example applies to the General Virtualization workload configuration only.
Item Description
Item Description
1
1 GbE Switch A (IPv6 enabled)
13
Connect Node 2, Port 4 to Switch A (IPv6
enabled)
2
Interconnect switch links
14
Connect Node 2, Port 2 to Switch A (IPv6
enabled)
3
Interconnect switch links
15
Connect Node 2, Port 3 to Switch B (IPv6
enabled)
4
1 GbE Switch B (IPv6 enabled)
16
Connect Node 2, Port 1 to Switch B (IPv6
enabled)
5
Connect Node 1, Port 4 to Switch A (IPv6
enabled)
17
1GbE RJ-45 port 2 (not used)
6
Connect Node 1, Port 2 to Switch A (IPv6
enabled)
18
1GbE RJ-45 port 3 (not used during initial
configuration; available for customer network)
7
Connect Node 1, Port 3 to Switch B (IPv6
enabled)
19
1GbE RJ-45 port 4 (not used during initial
configuration; available for customer network)
8
Connect Node 1, Port 1 to Switch B (IPv6
enabled)
20
Node 2
9
1GbE RJ-45 port 2 (for connection to a
laptop or workstation for setup)
21
1 GbE Switch
10
1GbE RJ-45 port 3 (not used during initial
configuration; available for customer
network)
22
Connect Node 2, iLO port to 1 GbE Switch
11
1GbE RJ-45 port 4 (not used during initial
configuration; available for customer
network)
23
Connect Node 1, iLO port to 1 GbE Switch
12
Node 1