Electrical grounding requirements
Electrical grounding requirements
The server must be grounded properly for proper operation and safety. In the United States, you must install the equipment in
accordance with NFPA 70, National Electric Code Article 250, as well as any local and regional building codes. In Canada, you must
install the equipment in accordance with Canadian Standards Association, CSA C22.1, Canadian Electrical Code. In all other countries,
you must install the equipment in accordance with any regional or national electrical wiring codes, such as the International
Electrotechnical Commission (IEC) Code 364, parts 1 through 7. Furthermore, you must be sure that all power distribution devices used
in the installation, such as branch wiring and receptacles, are listed or certified grounding-type devices.
Because of the high ground-leakage currents associated with multiple servers connected to the same power source, Hewlett Packard
Enterprise recommends the use of a PDU that is either permanently wired to the building’s branch circuit or includes a nondetachable
cord that is wired to an industrial-style plug. NEMA locking-style plugs or those complying with IEC 60309 are considered suitable for
this purpose. Using common power outlet strips for the server is not recommended.
Electrical grounding requirements
50
Содержание HPE ProLiant DL365 Gen10 Plus Server
Страница 7: ...10 5 Regulatory information 10 6 Documentation feedback ...
Страница 8: ...Component identification Component identification 8 ...
Страница 24: ...Device numbers 8 SFF device bay numbering 8 SFF 2 SFF device bay numbering Device numbers 24 ...
Страница 25: ...Drives Drives 25 ...
Страница 29: ...Fan bay numbering Fan bay numbering 29 ...
Страница 30: ...Operations Operations 30 ...
Страница 45: ...Setup Setup 45 ...
Страница 62: ...Hardware options installation Hardware options installation 62 ...
Страница 78: ...Installing an 8 SFF optical drive 78 ...
Страница 79: ...Universal media bay options Universal media bay options 79 ...
Страница 97: ...Secondary PCI riser options Secondary PCI riser options 97 ...
Страница 104: ...Full length Installing an expansion board in the secondary riser cage 104 ...
Страница 118: ...Installing an HPE Smart Array P816i a SR Gen10 Controller option 118 ...
Страница 119: ...Processor and heatsink options Processor and heatsink options 119 ...
Страница 143: ...HPE Trusted Platform Module 2 0 Gen10 Plus option HPE Trusted Platform Module 2 0 Gen10 Plus option 143 ...
Страница 146: ...Installing and enabling the HPE TPM 2 0 Gen10 Plus option Installing and enabling the HPE TPM 2 0 Gen10 Plus option 146 ...
Страница 147: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 147 ...
Страница 156: ...Software and configuration utilities Software and configuration utilities 156 ...
Страница 185: ...Keeping the system current Keeping the system current 185 ...
Страница 198: ...Troubleshooting Troubleshooting 198 ...
Страница 200: ...Cabling Cabling 200 ...
Страница 217: ...Support and other resources Support and other resources 217 ...