Installing a secondary full-height PCI riser cage option
Installing a secondary full-height PCI riser cage option
When installed, this riser cage supports full-height, 3/4-length expansion boards up to 9.5". PCIe3 slot 2 is no longer available.
Prerequisites
Prerequisites
This option requires a dual processor configuration.
Before installing this option, be sure you have the following:
The components included with the hardware option kit
Any expansion boards or controllers you plan to install
T-10 Torx screwdriver
T-15 Torx screwdriver
Procedure
Procedure
1. Power down the server (Power down the server).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack ( Extend the server from the rack ).
b. Remove the server from the rack ( Remove the server from the rack ).
4. Remove the access panel ( Remove the access panel).
5. Remove the primary PCI riser cage ( Remove the primary PCI riser cage).
6. Use a T-10 Torx screwdriver to remove the slot 2 bracket from the primary riser cage.
7. If installed, remove the low-profile riser cage.
Installing a secondary full-height PCI riser cage option
98
Содержание HPE ProLiant DL365 Gen10 Plus Server
Страница 7: ...10 5 Regulatory information 10 6 Documentation feedback ...
Страница 8: ...Component identification Component identification 8 ...
Страница 24: ...Device numbers 8 SFF device bay numbering 8 SFF 2 SFF device bay numbering Device numbers 24 ...
Страница 25: ...Drives Drives 25 ...
Страница 29: ...Fan bay numbering Fan bay numbering 29 ...
Страница 30: ...Operations Operations 30 ...
Страница 45: ...Setup Setup 45 ...
Страница 62: ...Hardware options installation Hardware options installation 62 ...
Страница 78: ...Installing an 8 SFF optical drive 78 ...
Страница 79: ...Universal media bay options Universal media bay options 79 ...
Страница 97: ...Secondary PCI riser options Secondary PCI riser options 97 ...
Страница 104: ...Full length Installing an expansion board in the secondary riser cage 104 ...
Страница 118: ...Installing an HPE Smart Array P816i a SR Gen10 Controller option 118 ...
Страница 119: ...Processor and heatsink options Processor and heatsink options 119 ...
Страница 143: ...HPE Trusted Platform Module 2 0 Gen10 Plus option HPE Trusted Platform Module 2 0 Gen10 Plus option 143 ...
Страница 146: ...Installing and enabling the HPE TPM 2 0 Gen10 Plus option Installing and enabling the HPE TPM 2 0 Gen10 Plus option 146 ...
Страница 147: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 147 ...
Страница 156: ...Software and configuration utilities Software and configuration utilities 156 ...
Страница 185: ...Keeping the system current Keeping the system current 185 ...
Страница 198: ...Troubleshooting Troubleshooting 198 ...
Страница 200: ...Cabling Cabling 200 ...
Страница 217: ...Support and other resources Support and other resources 217 ...