Operations 23
7.
Remove the existing PCI riser cage.
Retain the cage for future use.
Install the PCI riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server, and
disconnect all power cords before removing or installing the PCI riser cage.
To install the component:
1.
If cabled expansion boards are installed on the PCI riser cage, connect all necessary internal cabling
to the expansion boards.
For more information on these cabling requirements, see the documentation that ships with the
option.
2.
Align the riser board with the corresponding connectors on the system board, and then press down
the PCI riser cage.
3.
Install the access panel (on page
21
).
4.
Do one of the following:
Содержание hpe proliant dl20 gen9
Страница 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Страница 87: ...Cabling 87 H240 Host Bus Adapter cabling 2 bay LFF hot plug configuration 4 bay SFF hot plug configuration ...
Страница 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Страница 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Страница 120: ...Support and other resources 120 ...
Страница 121: ...Support and other resources 121 ...