Hardware options installation 47
5.
Remove the access panel (on page
20
).
6.
Remove the existing PCI riser cage ("
Remove the PCI riser cage
" on page
22
).
7.
If you intend to use an FBWC module, install the module on the storage controller.
a.
If you are installing a Smart Array P440 Controller, remove the air scoop.
b.
Connect the cache module backup power cable to the module.
c.
Install the cache module on the storage controller.
Содержание hpe proliant dl20 gen9
Страница 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Страница 87: ...Cabling 87 H240 Host Bus Adapter cabling 2 bay LFF hot plug configuration 4 bay SFF hot plug configuration ...
Страница 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Страница 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Страница 120: ...Support and other resources 120 ...
Страница 121: ...Support and other resources 121 ...