Hardware options installation 60
o
Slot 2
10.
Install the PCI riser cage (on page
23
).
11.
Connect the SATA cables to the SATA connectors on the system board.
12.
Based on riser cage configuration, route the M.2 SSD SATA cables in the following ways:
o
2 LFF configuration
—
Slot 2 of the FlexibleLOM riser cage assembly
Содержание hpe proliant dl20 gen9
Страница 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Страница 87: ...Cabling 87 H240 Host Bus Adapter cabling 2 bay LFF hot plug configuration 4 bay SFF hot plug configuration ...
Страница 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Страница 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Страница 120: ...Support and other resources 120 ...
Страница 121: ...Support and other resources 121 ...