1. TopVent
L1 L2 L3 N PE
-X20
-S4
1
ON
2 3 4 5 6 7 8
-J14
-S1
0 1
L1
L2
L3
N
PE
1
ON
2 3 4 5 6 7 8
1 2 3 4
-S1
-X11
-X9
1 2 3 4 5 6
-S5
L1
L2
L3
N
PE
1
ON
2 3 4 5 6 7 8
2. TopVent
L1 L2 L3 N PE
1 2 3 4
-X20
-S4
-S1
-X11
-X9
1 2 3 4 5 6
1
ON
2 3 4 5 6 7 8
-J14
-S1
0 1
-S1
L1
L2
L3
N
PE
1
ON
2 3 4 5 6 7 8
3. TopVent
L1 L2 L3 N PE
1 2 3 4
-X20
-S4
-X11
-X9
1 2 3 4 5 6
1
ON
2 3 4 5 6 7 8
-J14
-S1
0 1
8. TopVent
L1 L2 L3 N PE
-X20
-S4
1
ON
2 3 4 5 6 7 8
-J14
-S1
0 1
L1
L2
L3
N
PE
1
ON
2 3 4 5 6 7 8
1 2 3 4
-S1
-X11
-X9
1 2 3 4 5 6
5 x 2.5 mm²
5 x 2.5 mm²
5 x 2.5 mm²
5 x 2.5 mm²
2 x 0.5 mm²
2 x 0.5 mm²
2 x 0.5 mm²
400 V 3N AC / 50Hz
TempTronic
RC
2 x 0.5 mm²
3 x 2.5 mm²
4
3
2
1
-X6
3 4
2
1
-X4
6
5
2
1
-X6
4
3
2
1
-X5
L1 N PE
-X1
1 2 3
-X2
4 5 6
-X3
7 8 9 10
1 2 3 4 5 6
2 x 0.5 mm²
TempTronic
RC
■
1
Control panel (on site)
■
2
Variant: connection for TempTronic RC and option module
Fig. B5: Connection diagram
16
TopVent
®
DGV
Transport and installation
Содержание DGV-6/30
Страница 2: ......
Страница 4: ...2...
Страница 5: ...Safety A 1 Symbols 4 2 Operational safety 4 3 Information for a user manual 4 3 Safety Content...
Страница 20: ...18...
Страница 34: ...32...
Страница 76: ...74...
Страница 77: ...Operation I 1 Operation 76 2 Maintenance and repair 77 3 Dismantling 78 4 Disposal 78 75 Operation Content...
Страница 81: ......