14 | Optional equipment
138
60013444 • 01 • 01/2021 • en
1
3
6
2
4
5
7
8
1
Micro-granular compound hopper
5
Hopper empty sensor
2
Hose for micro-granular compound
transport
6
Seed bridging sensor
3
Metering auger
7
Differential pressure switch
4
Gate valve / blind cap
8
Calibrate switch
Depending on the granulate quantity, the metering unit can be fitted with different
augers.
The actual displacement depends on various factors and can therefore only be de-
termined by calibration.
NOTE
Ø
For the selection of the metering augers, refer also to the chapter
Appendix
.
Ø
Make sure that always metering augers of the same size are installed!
Changing the metering
augers
1. If the hopper is full, remove the blind cap and insert the gate valve (see access-
ory pack) into the slot.
2. Loosen the two wing nuts on the metering unit and pull out the lid with the
metering auger.
3. Pull the spring pin out of the shaft.
4. Replace the auger. Pay attention to the condition and correct fit of the O-ring
on the auger to be used.
5. Insert the spring pin.
6. Reinsert the parts into the metering unit.
7. Turn the screw further until the hexagon can be inserted into the drive from
the top.
8. Retighten the wing nuts.
9. Remove the gate valve and attach the blind cap.
Hopper blocked, metering auger removed
Содержание Maestro CX
Страница 2: ......
Страница 29: ...Technical data 4 60013444 01 01 2021 en 29 Maestro 12 CX 5550 6390 5900 2990 3890 2960 6790...
Страница 140: ...14 Optional equipment 140 60013444 01 01 2021 en 38 cm 66 cm...
Страница 181: ...60013444 01 01 2021 en 181 Notes...
Страница 182: ...182 60013444 01 01 2021 en...
Страница 183: ......