41
Maintenance
C
onsumables
Consumables and replacement periods
The consumables that need to be replaced and the replacement periods
are as follows. Replace each part at the appropriate timing to ensure
accurate measurement.
Membrane cap replacement guide
When the slope displayed on the meter is less than 80%
during calibration, clean the electrode (
electrode” (page 36)) and perform the calibration operation
again. If the slope is still less than 80% after that, replace the
membrane cap. If the response time is getting longer, also
replace the membrane cap (
The main unit of the electrode and ion electrode tip are not
repairable parts.
Service life
Replace after approx. 40 hours
Membrane cap
Replace consumables at the period whichever occurs first; approx. one
month after purchase or after approx. 40 hours of use depending on sample
solution, measurement frequency, and measurement environment.
approx. 1 month
approx. 1 month
approx. 1 month
Hours of use
Replace
Tip
Tip
approx. 1 year
approx. 1 year
Service life
Hours of use
approx. 1 year
Replace
Main unit of
electrode
Replace after approx. 400 hours
Replace consumables at the period whichever occurs first; approx. one year
after purchase or after approx. 400 hours of use, depending on sample
solution, measurement frequency, and measurement environment.
Содержание 5002S-10C
Страница 1: ...Instruction Manual Ammonia Electrode 5002S 10C ELECTRODE...
Страница 8: ......
Страница 26: ...14...
Страница 38: ...26...
Страница 58: ...46...
Страница 74: ...62...
Страница 77: ...65 Specifications External dimensions Unit mm 16 5 O D 18 85 150...