3. C300 Controller Installation and Upgrades
3.2. C300 Controller installation
R500
April 2017
Series 8 C300 Controller User's Guide
Honeywell
33
Figure 3 C300 Controller IOTA Board Features
Table 2 C300 Controller IOTA Board Connector Summary
C300 IOTA Board
Description
F1
Fuse
IOL1A, IOL1B (Gray cable)
IOL2A, IOL2B (Violet cable)
Redundant IOLINK connectors for IOLINK 1 and
IOLINK 2
IOLink A cable connectors are
Yellow
.
IOLink B cable connectors are
Green
.
Содержание Experion C300
Страница 8: ......
Страница 18: ......
Страница 30: ......
Страница 34: ......
Страница 45: ......
Страница 90: ......
Страница 107: ......
Страница 164: ......
Страница 199: ......
Страница 221: ......
Страница 236: ......
Страница 242: ......
Страница 285: ...Honeywell Process Solutions 1860 W Rose Garden Lane Phoenix AZ 85027 USA ...