ADI CD Boiler – Technical Manual
56
18.3 The boiler control unit and operating cycle
The control unit regulates:
•
The boiler operating cycle.
•
The boiler safeties (by indicating also the possible reasons for the boiler lockout).
•
The boiler power modulation.
Short description of the boiler operating cycle:
LEGEND of the operating phases:
Display
Meaning
00
Boiler in stand-by (the installation is not receiving any request of heat)
01
The boiler stops due to lack of gas pressure (minimum gas pressure switch)
02
Motor fan is activated (revolutions increase)
03
Start of the pre-venting phase
04
Time out (control of the fan speed)
05
Time of pre-ignition
06
Safety time of ignition and ionization control (constant)
07
Safety time of ignition and ionization control (variable)
10
Operation in the heating mode
11
Not available phase: D.H.W. operation
(according to the installation and to the boiler configuration)
12
Not available phase: Heating and D.H.W. operating in parallel
(according to the installation and to the boiler configuration)
20 / 21
Post air-venting and fan stop
22
Self-test and return to the initial position
99
Alarm / lockout (alarm code visualized on the display)
Содержание ADISA ADI CD 105
Страница 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Страница 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Страница 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Страница 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Страница 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...