ADI CD Boiler – Technical Manual
42
17.4 Gas supply
The gas supply pressure, the gas flow and the dimensions of the gas connection, they all depend on the type of
gas used, according to the boiler installed and to the current regulations.
Gas connection: the installation company has to install a three-pieces coupling per boiler in order to facilitate the
dismantling and the maintenance of every boiler.
The boiler incorporates a small mesh. If the connecting pipe is not clean or has particles, the mesh will
immediately block them, so the installation company will have to install a gas filter before the boiler gas
connection.
If the boilers gas pressure is higher than the maximum value indicated in this manual, it is necessary to install a
gas pressure governor so that the inlet working pressure can be in accordance with the values required.
It is advisable to install a flue gas header previous to the boilers that will operate as a gas inertial tank when the
boilers start working.
When different consumptions are simultaneously required, the dimensions of the gas pipes and of the gas
connections must be calculated so that, when all the consumptions are demanded simultaneously, the inlet
working gas pressure to each boiler will correspond to the values indicated in this manual (see table
TECHNICAL DATA).
17.4.1 Gas pressure higher than 45 mbar
Units
Boiler model
Inertial
volume
m3
1
ADI CD 105
0.0102
1
ADI CD 130
0.0128
1
ADI CD 150
0.0146
1
ADI CD 200
0.0186
1
ADI CD 250
0.0225
1
ADI CD 275
0.0251
1
ADI CD 325
0.0310
1
ADI CD 400
0.0368
1
ADI CD 475
0.0449
1
ADI CD 550
0.0529
1
ADI CD 650
0.0598
1
ADI CD 750
0.0672
1
ADI CD 850
0.0772
1
ADI CD 950
0.0872
2
ADI CD 325
0.0621
2
ADI CD 400
0.0736
2
ADI CD 475
0.0899
2
ADI CD 550
0.1058
2
ADI CD 650
0.1196
2
ADI CD 750
0.1344
2
ADI CD 850
0.1543
2
ADI CD 950
0.1743
3
ADI CD 325
0.0931
3
ADI CD 400
0.1104
3
ADI CD 475
0.1348
3
ADI CD 550
0.1587
3
ADI CD 650
0.1794
3
ADI CD 750
0.2009
3
ADI CD 850
0.2315
3
ADI CD 950
0.2615
A gas pressure governor must be installed to reduce
pressure to a value in accordance with the table of
paragraph “Technical data”. To select the type and its
speed of opening/closing, consult the Technical
Department of ADISA HEATING BY HITECSA.
An inertial tank must be installed between the gas
pressure governor and the boiler, acting as a gas
inertial volume when the boiler starts up and as an
absorber/compensating of the pressure rise produced
by the closing of the gas pressure governor when the
boiler stops (see diagrams below).
Its volume will be at least equal to 1/1000 of the boilers
maximum flow per hour.
This inertial tank must be placed as close as possible
to the boiler.
2
ESQUEMA VARIAS CALDERAS
4
5
3
1
ESQUEMA UNA CALDERA
DIAGRAM OF 1 BOILER
DIAGRAM OF SEVERAL BOILERS
1.
BOILER
2.
GAS INERTIAL TANK
3.
GAS FILTRE
4.
GAS GOVERNOR
5.
MANOMETER
Содержание ADISA ADI CD 105
Страница 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Страница 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Страница 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Страница 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Страница 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...