ADI CD Boiler – Technical Manual
3
17.4.1 Gas pressure higher than 45 mbar ___________________________________________________________ 42
17.5 Draining of the boiler condensate ______________________________________________________________ 43
17.5.1 Water conde nsing _________________________________________________________________________ 43
17.5.2 Condensate neutralization treatment _________________________________________________________ 43
17.5.3 Condensate drainage ______________________________________________________________________ 43
17.5.4 Boiler chimney ____________________________________________________________________________ 43
17.6 Chimneys _________________________________________________________________________________ 44
17.6.1 Chimney sizing ___________________________________________________________________________ 44
17.6.2 Flue draught stabilizer _____________________________________________________________________ 45
17.6.3 Old installation ___________________________________________________________________________ 45
17.6.4 Adjustable flue damper at the boiler flue outlet ________________________________________________ 46
17.7 Hydraulic installation _______________________________________________________________________ 47
17.7.1 Data to be considered ______________________________________________________________________ 47
17.7.2 Overpressure safety valve __________________________________________________________________ 47
17.7.3 Hydraulic pressure drop ___________________________________________________________________ 48
17.7.6 System drawings __________________________________________________________________________ 51
18. THE BOILER START-UP _________________________________________________________________________ 55
18.1 Before the start-up __________________________________________________________________________ 55
18.2 Gas pressure switch _________________________________________________________________________ 55
18.3 The boiler control unit and operating cycle _____________________________________________________ 56
18.4 Gas/air adjustments _________________________________________________________________________
57
18.4.1 Combustion adjustment ____________________________________________________________________
57
18.4.2 Change of fuel: from Propane gas to Natural gas _______________________________________________ 60
19. MAINTENANCE ________________________________________________________________________________ 61
19.1 Procedure to dismantle the burner ____________________________________________________________ 61
19.2 Position of probes and sensors ________________________________________________________________ 63
20. BOILER GUARANTEE___________________________________________________________________________
64
21. APPENDIX I: LIST OF ERROR CODESERROR _______________________________________________________
66
Data indicated in the present manual are liable to changes.
ADISA HEATING BY HITECSA (HIPLUS AIRE ACONDICIONADO S.L.) has the right to make modifications
without notice of any product of its range.
No company, person or entity external to ADISA HEATING BY HITECSA (HIPLUS AIRE ACONDICIONADO
S.L.) can modify this document.
Содержание ADISA ADI CD 105
Страница 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 4 2020 uk ADI CD CONDENSING BOILER...
Страница 7: ...ADI CD Boiler Technical Manual 7 Models ADI CD 200 and higher...
Страница 31: ...ADI CD Boiler Technical Manual 31 12 1 Electric drawing ADI CD 70 750...
Страница 32: ...ADI CD Boiler Technical Manual 32 12 2 Electric drawing ADI CD 850 950...
Страница 69: ...www adisaheating com ADISA HEATING HIPLUS AIRE ACONDICIONADO S L...