147
Safety and control device setting
SMGB0066 rev.0 - 12/2009
Controller pack
Service Manual
4
Hot Gas Bypass OFF
Hot gas Bypass OFF
Compressor Frequency
70 Hz Output
Compressor Frequency
60 Hz Output
Defrosting Finish
Condition Fulfilled
60 sec passed
after (*1)?
6 min passed from
desfrosting start?
Pd ≥ 3.6 MPa?
4.25.1. defrost operation control
Compressor Frequency
40 Hz Output (*1)
10 Sec Count
Hot Gas bypass Solenoid
Valve (20G ON)
1 Sec Count
Fan stop, 4-way valve switching
Main expansion valve “a pulse” *2
10 Sec Count
Compressor Frequency
Retention
* Fan 1 step operation start
Defrosting
Conditions Fulfilled
Compressor Real
Frequency = 40 Hz?
Tr ≤ - 2ºC?
Tr ≥ - 2ºC?
Ps ≥ 1.0 MPa ?
1 min passed from
defrosting start?
3 min passed from
defrosting start?
Tr ≤ - 10ºC?
Fan in operation?
Pd ≥3.0 MPa?
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
<Start Defrosting>
<Anti-Defrosting at
Liquefaction>
* At operation start, 6-step operation for 10 seconds
and 1-step operation thereafter
<Prevent Ps Over-increase by
Hot Gas>
<Anti-Defrosting when Empty>
<Anti-Defrosting at
Liquefaction>
No
No
No
No
No
No
No
No
No
No
No
Fan OFF if in operation
note
For desfrosting, operate at the compressor frequency shown in
-
the defrosting flow chart (without applying upper/lower limit).
Liquid injection shall be OFF at desfrosting.
-
Содержание RHUE-3AVHN
Страница 1: ...Air to water Heat pump RHUE 3AVHN RHUE 4AVHN RHUE 5A V HN RHUE 6A V HN YUTAKI SERIES RHUE A V HN ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 16: ......
Страница 34: ......
Страница 70: ......
Страница 166: ......
Страница 236: ...Spare parts Service Manual 234 Spare parts of Yutaki SMGB0066 rev 0 12 2009 8 2 2 DHWT Domestic Hot Water Tank ...
Страница 238: ......
Страница 260: ......
Страница 261: ......
Страница 262: ...SMGB0066 rev 0 12 2009 Printed in Spain ...