
Phenomenon
Cause
Check item
Action
(Turn OFF the main switch)
Disconnected wires, insufficient
contacting or incorrect connection
Between control PCB, inverter PCB
and FANM
Check the continuity of wires.
Check for looseness of the
connection screws. Check the
connection No.
Replacing wires, repairing,
tightening screws and incorrect
wiring
Power source wiring for the outdoor
unit
Faulty PCB (PCB1 for the control,
PCB for the inverter)
Disconnected wires to PCB
Check the connections
Repair the wiring connections
Faulty PCB
Replace PCB if faulty
Incorrect wiring
Disconnected wires;
insufficient contacting
Check the continuity.
Check for looseness of connection
screws
Replacing wires, repairing,
tightening screws
Incorrect wiring
Check the connection nos.
Correctly connect the wires
8 Troubleshooting
219
SMGB0060 rev. 1- 12/2010
8
Содержание RAS-10HRNM
Страница 2: ......
Страница 4: ...Index ii SMGB0060 rev 1 12 2010 ...
Страница 56: ...2 Unit Installation 48 SMGB0060 rev 1 12 2010 ...
Страница 117: ...RAS 4 6 HVRNM1E 4 Electrical Wiring 109 SMGB0060 rev 1 12 2010 4 ...
Страница 118: ...RAS 4 6 HRNM1E 4 Electrical Wiring 110 SMGB0060 rev 1 12 2010 ...
Страница 120: ...4 6 2 Electrical wiring diagrams for ES Series RAS 2 2 5 HVRN1 E 4 Electrical Wiring 112 SMGB0060 rev 1 12 2010 ...
Страница 121: ...RAS 3HVRNS 4 Electrical Wiring 113 SMGB0060 rev 1 12 2010 4 ...
Страница 122: ...RAS 4 6 HVRNS1E 4 Electrical Wiring 114 SMGB0060 rev 1 12 2010 ...
Страница 123: ...RAS 8 10 HRNSE 4 Electrical Wiring 115 SMGB0060 rev 1 12 2010 4 ...
Страница 124: ...4 Electrical Wiring 116 SMGB0060 rev 1 12 2010 ...
Страница 145: ...Dry operation Continues in the next page 5 Control System 137 SMGB0060 rev 1 12 2010 5 ...
Страница 147: ...Heating operation Continues in the next page 5 Control System 139 SMGB0060 rev 1 12 2010 5 ...
Страница 148: ...5 Control System 140 SMGB0060 rev 1 12 2010 ...
Страница 153: ...Activation for protection device control 5 Control System 145 SMGB0060 rev 1 12 2010 5 ...
Страница 162: ...Activation for protection device control 5 Control System 154 SMGB0060 rev 1 12 2010 ...
Страница 166: ...Preheating control of compressor 5 Control System 158 SMGB0060 rev 1 12 2010 ...
Страница 168: ...5 Control System 160 SMGB0060 rev 1 12 2010 ...
Страница 180: ...6 Optional functions 172 SMGB0060 rev 1 12 2010 ...
Страница 224: ...8 Troubleshooting 216 SMGB0060 rev 1 12 2010 ...
Страница 263: ...RAS 4 6 HVRNS1E 8 Troubleshooting 255 SMGB0060 rev 1 12 2010 8 ...
Страница 264: ...RAS 8 10 HRNSE 8 Troubleshooting 256 SMGB0060 rev 1 12 2010 ...
Страница 269: ...RAS 8 10 HRNSE 8 Troubleshooting 261 SMGB0060 rev 1 12 2010 8 ...
Страница 334: ...9 1 Spare parts for IVX Series RAS 3HVRNME Cycle and structural parts 9 Spare Parts 326 SMGB0060 rev 1 12 2010 ...
Страница 337: ...RAS 4 6 HVRNM1E Cycle and structural parts 9 Spare Parts 329 SMGB0060 rev 1 12 2010 9 ...
Страница 340: ...RAS 4 6 HRNM1E Cycle and structural parts 9 Spare Parts 332 SMGB0060 rev 1 12 2010 ...
Страница 342: ... Electrical parts 9 Spare Parts 334 SMGB0060 rev 1 12 2010 ...
Страница 353: ...RAS 4 6 HVRNS1E Cycle structural and electrical parts 9 Spare Parts 345 SMGB0060 rev 1 12 2010 9 ...
Страница 354: ... Electrical parts 9 Spare Parts 346 SMGB0060 rev 1 12 2010 ...
Страница 356: ...RAS 8 10 HRNSE Cycle and structural 9 Spare Parts 348 SMGB0060 rev 1 12 2010 ...
Страница 359: ... Electrical parts 9 Spare Parts 351 SMGB0060 rev 1 12 2010 9 ...
Страница 440: ...10 Servicing 432 SMGB0060 rev 1 12 2010 ...
Страница 464: ...11 Electrical checks of main parts 456 SMGB0060 rev 1 12 2010 ...
Страница 481: ......