
7.4 Test run procedure from the outdoor unit side
The test run procedure from the outdoor unit side is shown below.
You can set this DIP switch while the power source is ON.
Setting of dip switch
DSW1
1
Cooling: Pin 1 ON
2
Heating: Pin 1, 2 ON
3
Cooling intermediate season: Pin 1, 3 ON
4
Heating intermediate season: Pin 1, 2, 3 ON
5
Manual compressor OFF: Pin 4 ONe
D A N G E R
•
Do not touch any other electrical components while you are setting the switches on the PCB.
•
Do not attach or detach the service access panel when the power source for the outdoor unit is ON and the
outdoor unit is operating.
•
Set all the DIP switches of DSW1 to OFF after completing the test run.
Dip switch seting
Operation
Remarks
Test run
1. Setting operation mode
•
The indoor unit automatically
starts to operate when the
test run of the outdoor unit is
set.
•
You can perform the ON/OFF
operation from the remote
control switch or the DSW1 of
the outdoor unit.
•
Continuous operation during
2 hours is performed without
the Thermo-OFF condition.
•
Make sure that the indoor
units start to operate in
accord with the test run of the
outdoor unit.
•
If you start the test run from
the outdoor unit and you stop
the test run from the remote
control switch, the test run
function of the remote control
switch is cancelled. However,
the test run function of the
outdoor unit is not cancelled.
•
If the more than one indoor
unit is connected with one
remote control switch, all the
units start the test run at the
same time. Therefore, turn
OFF the power source so that
the indoor units do not
perform the test run. If this is
the case, the TEST RUN
indication of the remote
control switch may flicker.
This is not abnormal.
•
The setting of DSW1 is not
required for the test run from
the remote control switch.
(a) Cooling:
Set DSW1-1 ON
(b) Heating
SET DSW1-1 and 2 ON
(c)
Cooling
intermediate
season:
Set DSW1-1 and 3 ON
(d)
Heating
intermediate
season:
Set DSW1-1, 2 and 3 ON
Manual OFF of
compressor
2. Forced stoppage of compressor:
•
When DSW1-4 is ON during
the compressor operation,
the compressor stops
operating immediately and
the indoor unit is under the
Thermo-OFF condition.
•
When DSW1-4 is OFF, the
compressor starts to operate
after the cancellation of the 3-
minute guard.
•
Do not turn ON and OFF the
compressor frequently
Set DSW1-1 ON
7 Test Run
180
SMGB0060 rev. 1- 12/2010
Содержание RAS-10HRNM
Страница 2: ......
Страница 4: ...Index ii SMGB0060 rev 1 12 2010 ...
Страница 56: ...2 Unit Installation 48 SMGB0060 rev 1 12 2010 ...
Страница 117: ...RAS 4 6 HVRNM1E 4 Electrical Wiring 109 SMGB0060 rev 1 12 2010 4 ...
Страница 118: ...RAS 4 6 HRNM1E 4 Electrical Wiring 110 SMGB0060 rev 1 12 2010 ...
Страница 120: ...4 6 2 Electrical wiring diagrams for ES Series RAS 2 2 5 HVRN1 E 4 Electrical Wiring 112 SMGB0060 rev 1 12 2010 ...
Страница 121: ...RAS 3HVRNS 4 Electrical Wiring 113 SMGB0060 rev 1 12 2010 4 ...
Страница 122: ...RAS 4 6 HVRNS1E 4 Electrical Wiring 114 SMGB0060 rev 1 12 2010 ...
Страница 123: ...RAS 8 10 HRNSE 4 Electrical Wiring 115 SMGB0060 rev 1 12 2010 4 ...
Страница 124: ...4 Electrical Wiring 116 SMGB0060 rev 1 12 2010 ...
Страница 145: ...Dry operation Continues in the next page 5 Control System 137 SMGB0060 rev 1 12 2010 5 ...
Страница 147: ...Heating operation Continues in the next page 5 Control System 139 SMGB0060 rev 1 12 2010 5 ...
Страница 148: ...5 Control System 140 SMGB0060 rev 1 12 2010 ...
Страница 153: ...Activation for protection device control 5 Control System 145 SMGB0060 rev 1 12 2010 5 ...
Страница 162: ...Activation for protection device control 5 Control System 154 SMGB0060 rev 1 12 2010 ...
Страница 166: ...Preheating control of compressor 5 Control System 158 SMGB0060 rev 1 12 2010 ...
Страница 168: ...5 Control System 160 SMGB0060 rev 1 12 2010 ...
Страница 180: ...6 Optional functions 172 SMGB0060 rev 1 12 2010 ...
Страница 224: ...8 Troubleshooting 216 SMGB0060 rev 1 12 2010 ...
Страница 263: ...RAS 4 6 HVRNS1E 8 Troubleshooting 255 SMGB0060 rev 1 12 2010 8 ...
Страница 264: ...RAS 8 10 HRNSE 8 Troubleshooting 256 SMGB0060 rev 1 12 2010 ...
Страница 269: ...RAS 8 10 HRNSE 8 Troubleshooting 261 SMGB0060 rev 1 12 2010 8 ...
Страница 334: ...9 1 Spare parts for IVX Series RAS 3HVRNME Cycle and structural parts 9 Spare Parts 326 SMGB0060 rev 1 12 2010 ...
Страница 337: ...RAS 4 6 HVRNM1E Cycle and structural parts 9 Spare Parts 329 SMGB0060 rev 1 12 2010 9 ...
Страница 340: ...RAS 4 6 HRNM1E Cycle and structural parts 9 Spare Parts 332 SMGB0060 rev 1 12 2010 ...
Страница 342: ... Electrical parts 9 Spare Parts 334 SMGB0060 rev 1 12 2010 ...
Страница 353: ...RAS 4 6 HVRNS1E Cycle structural and electrical parts 9 Spare Parts 345 SMGB0060 rev 1 12 2010 9 ...
Страница 354: ... Electrical parts 9 Spare Parts 346 SMGB0060 rev 1 12 2010 ...
Страница 356: ...RAS 8 10 HRNSE Cycle and structural 9 Spare Parts 348 SMGB0060 rev 1 12 2010 ...
Страница 359: ... Electrical parts 9 Spare Parts 351 SMGB0060 rev 1 12 2010 9 ...
Страница 440: ...10 Servicing 432 SMGB0060 rev 1 12 2010 ...
Страница 464: ...11 Electrical checks of main parts 456 SMGB0060 rev 1 12 2010 ...
Страница 481: ......