
Additional information for “Check list on compressor”
Check item
Additional information (mechanism of compressor failure)
1 & 2
The liquid refrigerant return volume to the compressor is controlled by the discharge gas temperature
Td when compressor is operating. If Td thermistor is disconnected, the liquid refrigerant return volume
will become small by detecting the temperature even if the actual discharge gas temperature is high.
Therefore, this abnormal overheating by detecting the temperature operation will result in insulation
failure of the motor winding.
3 & 4
Overcurrent control (operating frequency control) is performed by detecting current by the PCB2. In
this case, winding insulation failure will occur, since control is not available in spite of actually high
current.
5 & 6
The current sensor checks phase and adjusts output electrical wave in addition to the above
mentioned items. If fault occurs, the output electrical wave becomes unstable giving stress to the
motor winding, resulting in winding insulation failure.
7 & 8
During a cooling operation, SH is controlled by MV of each indoor units. During a heating operation,
Td is controlled by MV1. If expansion valves are incorrectly connected, correct control is not available,
resulting in compressor seizure depending on liquid refrigerant returning conditions or motor winding
insulation failure depending on overheating conditions.
9
If the refrigeration cycle and electrical system are incorrectly connected, abnormally low suction
pressure operation is maintained or abnormally high discharge pressure operation is maintained,
resulting in giving stress to the compressor, since their correct control is not available.
10
If the expansion valve and electrical system are incorrectly connected, abnormally low suction
pressure operation is maintained or abnormally high discharge pressure operation is maintained,
resulting in giving stress to the compressor, since their correct control is not available.
11
The compressor may be locked due to the liquid return operation during the cooling operation .
12
In the case that the contacting resistance becomes big, voltage imbalance among each phase will
cause abnormal overcurrent.
13
In this case, overcurrent will occur, efficiency will decrease or the motor winding will be excessively
heated.
14
In the case, it will result in motor burning or compressor failure
7 Test Run
194
SMGB0060 rev. 1- 12/2010
Содержание RAS-10HRNM
Страница 2: ......
Страница 4: ...Index ii SMGB0060 rev 1 12 2010 ...
Страница 56: ...2 Unit Installation 48 SMGB0060 rev 1 12 2010 ...
Страница 117: ...RAS 4 6 HVRNM1E 4 Electrical Wiring 109 SMGB0060 rev 1 12 2010 4 ...
Страница 118: ...RAS 4 6 HRNM1E 4 Electrical Wiring 110 SMGB0060 rev 1 12 2010 ...
Страница 120: ...4 6 2 Electrical wiring diagrams for ES Series RAS 2 2 5 HVRN1 E 4 Electrical Wiring 112 SMGB0060 rev 1 12 2010 ...
Страница 121: ...RAS 3HVRNS 4 Electrical Wiring 113 SMGB0060 rev 1 12 2010 4 ...
Страница 122: ...RAS 4 6 HVRNS1E 4 Electrical Wiring 114 SMGB0060 rev 1 12 2010 ...
Страница 123: ...RAS 8 10 HRNSE 4 Electrical Wiring 115 SMGB0060 rev 1 12 2010 4 ...
Страница 124: ...4 Electrical Wiring 116 SMGB0060 rev 1 12 2010 ...
Страница 145: ...Dry operation Continues in the next page 5 Control System 137 SMGB0060 rev 1 12 2010 5 ...
Страница 147: ...Heating operation Continues in the next page 5 Control System 139 SMGB0060 rev 1 12 2010 5 ...
Страница 148: ...5 Control System 140 SMGB0060 rev 1 12 2010 ...
Страница 153: ...Activation for protection device control 5 Control System 145 SMGB0060 rev 1 12 2010 5 ...
Страница 162: ...Activation for protection device control 5 Control System 154 SMGB0060 rev 1 12 2010 ...
Страница 166: ...Preheating control of compressor 5 Control System 158 SMGB0060 rev 1 12 2010 ...
Страница 168: ...5 Control System 160 SMGB0060 rev 1 12 2010 ...
Страница 180: ...6 Optional functions 172 SMGB0060 rev 1 12 2010 ...
Страница 224: ...8 Troubleshooting 216 SMGB0060 rev 1 12 2010 ...
Страница 263: ...RAS 4 6 HVRNS1E 8 Troubleshooting 255 SMGB0060 rev 1 12 2010 8 ...
Страница 264: ...RAS 8 10 HRNSE 8 Troubleshooting 256 SMGB0060 rev 1 12 2010 ...
Страница 269: ...RAS 8 10 HRNSE 8 Troubleshooting 261 SMGB0060 rev 1 12 2010 8 ...
Страница 334: ...9 1 Spare parts for IVX Series RAS 3HVRNME Cycle and structural parts 9 Spare Parts 326 SMGB0060 rev 1 12 2010 ...
Страница 337: ...RAS 4 6 HVRNM1E Cycle and structural parts 9 Spare Parts 329 SMGB0060 rev 1 12 2010 9 ...
Страница 340: ...RAS 4 6 HRNM1E Cycle and structural parts 9 Spare Parts 332 SMGB0060 rev 1 12 2010 ...
Страница 342: ... Electrical parts 9 Spare Parts 334 SMGB0060 rev 1 12 2010 ...
Страница 353: ...RAS 4 6 HVRNS1E Cycle structural and electrical parts 9 Spare Parts 345 SMGB0060 rev 1 12 2010 9 ...
Страница 354: ... Electrical parts 9 Spare Parts 346 SMGB0060 rev 1 12 2010 ...
Страница 356: ...RAS 8 10 HRNSE Cycle and structural 9 Spare Parts 348 SMGB0060 rev 1 12 2010 ...
Страница 359: ... Electrical parts 9 Spare Parts 351 SMGB0060 rev 1 12 2010 9 ...
Страница 440: ...10 Servicing 432 SMGB0060 rev 1 12 2010 ...
Страница 464: ...11 Electrical checks of main parts 456 SMGB0060 rev 1 12 2010 ...
Страница 481: ......