
Defrost operation signal (04)
This optional signal is used to pick up when defrosting turns on. It is very useful to check if the indoor unit is in thermo-OFF.
Connect the cabling and use the materials as shown in
Available ports
, see on page 162
Note that the contact of auxiliary relay X3 is closed when an operation signal is issued.
6.1.5 Optional functions
Programming
The optional signals are programmed through the PCB of the outdoor unit.
Setting of the optional signals
The optional signals of the outdoor unit are set up from the PCB of the outdoor unit and push switches PSW1, PSW2 and
PSW3.
6 Optional functions
167
SMGB0060 rev. 1- 12/2010
6
Содержание RAS-10HRNM
Страница 2: ......
Страница 4: ...Index ii SMGB0060 rev 1 12 2010 ...
Страница 56: ...2 Unit Installation 48 SMGB0060 rev 1 12 2010 ...
Страница 117: ...RAS 4 6 HVRNM1E 4 Electrical Wiring 109 SMGB0060 rev 1 12 2010 4 ...
Страница 118: ...RAS 4 6 HRNM1E 4 Electrical Wiring 110 SMGB0060 rev 1 12 2010 ...
Страница 120: ...4 6 2 Electrical wiring diagrams for ES Series RAS 2 2 5 HVRN1 E 4 Electrical Wiring 112 SMGB0060 rev 1 12 2010 ...
Страница 121: ...RAS 3HVRNS 4 Electrical Wiring 113 SMGB0060 rev 1 12 2010 4 ...
Страница 122: ...RAS 4 6 HVRNS1E 4 Electrical Wiring 114 SMGB0060 rev 1 12 2010 ...
Страница 123: ...RAS 8 10 HRNSE 4 Electrical Wiring 115 SMGB0060 rev 1 12 2010 4 ...
Страница 124: ...4 Electrical Wiring 116 SMGB0060 rev 1 12 2010 ...
Страница 145: ...Dry operation Continues in the next page 5 Control System 137 SMGB0060 rev 1 12 2010 5 ...
Страница 147: ...Heating operation Continues in the next page 5 Control System 139 SMGB0060 rev 1 12 2010 5 ...
Страница 148: ...5 Control System 140 SMGB0060 rev 1 12 2010 ...
Страница 153: ...Activation for protection device control 5 Control System 145 SMGB0060 rev 1 12 2010 5 ...
Страница 162: ...Activation for protection device control 5 Control System 154 SMGB0060 rev 1 12 2010 ...
Страница 166: ...Preheating control of compressor 5 Control System 158 SMGB0060 rev 1 12 2010 ...
Страница 168: ...5 Control System 160 SMGB0060 rev 1 12 2010 ...
Страница 180: ...6 Optional functions 172 SMGB0060 rev 1 12 2010 ...
Страница 224: ...8 Troubleshooting 216 SMGB0060 rev 1 12 2010 ...
Страница 263: ...RAS 4 6 HVRNS1E 8 Troubleshooting 255 SMGB0060 rev 1 12 2010 8 ...
Страница 264: ...RAS 8 10 HRNSE 8 Troubleshooting 256 SMGB0060 rev 1 12 2010 ...
Страница 269: ...RAS 8 10 HRNSE 8 Troubleshooting 261 SMGB0060 rev 1 12 2010 8 ...
Страница 334: ...9 1 Spare parts for IVX Series RAS 3HVRNME Cycle and structural parts 9 Spare Parts 326 SMGB0060 rev 1 12 2010 ...
Страница 337: ...RAS 4 6 HVRNM1E Cycle and structural parts 9 Spare Parts 329 SMGB0060 rev 1 12 2010 9 ...
Страница 340: ...RAS 4 6 HRNM1E Cycle and structural parts 9 Spare Parts 332 SMGB0060 rev 1 12 2010 ...
Страница 342: ... Electrical parts 9 Spare Parts 334 SMGB0060 rev 1 12 2010 ...
Страница 353: ...RAS 4 6 HVRNS1E Cycle structural and electrical parts 9 Spare Parts 345 SMGB0060 rev 1 12 2010 9 ...
Страница 354: ... Electrical parts 9 Spare Parts 346 SMGB0060 rev 1 12 2010 ...
Страница 356: ...RAS 8 10 HRNSE Cycle and structural 9 Spare Parts 348 SMGB0060 rev 1 12 2010 ...
Страница 359: ... Electrical parts 9 Spare Parts 351 SMGB0060 rev 1 12 2010 9 ...
Страница 440: ...10 Servicing 432 SMGB0060 rev 1 12 2010 ...
Страница 464: ...11 Electrical checks of main parts 456 SMGB0060 rev 1 12 2010 ...
Страница 481: ......